PROJECT IMAGES
Select an image to explore its details.
Muzn Mining Company Project
SCOPE OF WORK
Integrated CIC production line operated and managed by CELLTECH PRIME, with processing vats, manufactured equipment, and a successful trial run.
Scope of work: Design, construction, and operation of an integrated CIC gold processing and recovery production line, including:
• Full operation and management: CELLTECH PRIME became the project's Plant Operator, with its engineering teams fully managing and operating the plant and recovery processes.
• Design and construction of Processing Vats.
• Design and manufacture of high-efficiency Carbon Columns.
• An integrated connection network linking production lines and processing stages.
• Supply and installation of the Electro-winning Cell.
• Design and manufacture of the Smelting Furnace for final refining, followed by a trial production run that demonstrated the efficiency of the entire line.
CIC line design, construction, and operation, with plant management, equipment manufacture, and electrical cell supply and installation.